Projects

Portfolio.

Two documented projects — one in development, one in operation — and the structure in which further ones will appear. What is not listed here, we do not develop either.

Projects

Filterable by technology and development stage reached. The miniature axis on each row shows the same sequence as the development stages page.

Technology
Development stage
  • Power
    2 MW
    Capacity
    4,472 MWh
    Grid operator
    Bayernwerk Netz
    Federal state
    Bavaria
    Technology
    Storage & solar
    Time horizon
    RtB 2027
    Stage: Land
  • Power
    100 kW
    Capacity
    193.5 kWh
    Grid operator
    to follow
    Federal state
    Carinthia (AT)
    Technology
    Storage & solar
    Time horizon
    in operation since 08/2025
    Stage: COD
  • Standalone large-scale storage — structure

    Structural example
    Power
    to follow
    Capacity
    to follow
    Grid operator
    to follow
    Federal state
    Southern Germany
    Technology
    Battery storage
    Time horizon
    to follow
    Stage: Greenfield
  • Co-location with existing PV — structure

    Structural example
    Power
    to follow
    Capacity
    to follow
    Grid operator
    to follow
    Federal state
    to follow
    Technology
    Storage & solar
    Time horizon
    to follow
    Stage: Greenfield
  • Industrial behind-the-meter storage — structure

    Structural example
    Power
    to follow
    Capacity
    to follow
    Grid operator
    to follow
    Federal state
    to follow
    Technology
    Behind the meter
    Time horizon
    to follow
    Stage: Greenfield

Rows marked “structural example” are not projects; they show what an entry will look like. We do not list ventures without a secured basis — a pipeline figure that cannot be evidenced is a liability in due diligence.

Why there is little here

A developer of our size does not have a list of a hundred sites, and we do not pretend otherwise. What puts a project on this page is not intent but secured land and a verifiable procedural status.

For projects developed on behalf of or together with partners, confidentiality comes before visibility. For institutional enquiries we open the data room instead — it holds considerably more than this page.

Request access to the pipeline.

For institutional investors we provide project documentation and access to structured data rooms.

Request access